Smart Control Module instructions

Installation (for TU12 sheer curtain motor)

1. Using a flathead screwdriver, remove the SCM compartment cover as shown.

2. Insert the SCM into the compartment top first, then snap the bottom into place.

 

Network Commissioning

  1. Ensure motor is not in Deep Sleep
  2. Press the SCM button The SCM Status LED will start a blink sequence with 4 quick green blinks followed by a short pause.
  3. At this time, complete the commissioning process by following the on-screen instructions of the desired smart-home ecosystem provider.
 Important

If the motor was in Deep Sleep Mode when the SCM is first installed, please wake the motor up, then initialise the SCM by pressing the SCM button once. The SCM Status LED will blink green once to indicate successful initialisation. Then proceed to step #1.

SCM Factory Reset

  1. Press and hold the SCM button until the SCM Status LED lights up as solid amber.
  2. Release the SCM button
 Important

If the SCM has been previously commissioned to a network, a factory reset is required before it can be com- missioned once more.